Thursday, 15. June. We progress smoothly ....


Another day with beautiful weather. After some further tests with the liquid in the newly drilled bore hole we started drilling.

It was a productive day where we drilled 22.34m of core.

We evaluate the drill liquid, and are sofar happy with it. We need the centrifuge 1-2 times pr. run, and the centrifuging takes 13 min. This is sofar the slowest part of the drill process.

We drill and process the core in two shifts from 18 pm to 10 am in order to take advantage of the colder nights. The workday usually ends with a cold beer in front of the weatherport when the sun begins to warm at 10.
We had chicken for lunch (chef Peter) and salmon with vegetables for dinner (chef Nancy). We have been in contact with Copenhagen in Kangerlussuaq.